100 | _aKarki, Roshan Raj | ||
245 | _aA Project Report: Pre-Feasibility Study of Madhye Bhotekoshi Hydropower and its Headrace Tunnel Support Analysis. | ||
260 |
_aKathmandu: Nepa., _bTribhuwan University: Institute of Engineering, Thapathali Campus; Department of Civil Engineering. _cApril, 2023. |
||
300 | _axiv; 73p.illus. | ||
504 | _aIncludes Bibliography References | ||
650 | _aHydroelectric power plants---Nepal | ||
650 | _aElectric power plants | ||
650 | _awater power-- Bhotekoshi | ||
650 | _aTunnel | ||
700 | _aLamichhane, Rupak | ||
700 | _aThapa, Saurav Godar | ||
700 | _aGurung, Sekendra | ||
700 | _aPradhan, Sulav | ||
700 | _a Gaire, Sharma Utsav | ||