000 00935nam a22002657a 4500
005 20250709163649.0
008 250303b |||||||| |||| 00| 0 eng d
041 _aEnglish
082 _a621.31K18h/2023
100 _aKarki, Roshan Raj
245 _aA Project Report: Pre-Feasibility Study of Madhye Bhotekoshi Hydropower and its Headrace Tunnel Support Analysis.
260 _aKathmandu: Nepa.,
_bTribhuwan University: Institute of Engineering, Thapathali Campus; Department of Civil Engineering.
_cApril, 2023.
300 _axiv; 73p.illus.
504 _aIncludes Bibliography References
650 _aHydroelectric power plants---Nepal
650 _aElectric power plants
650 _awater power-- Bhotekoshi
650 _aTunnel
700 _aLamichhane, Rupak
700 _aThapa, Saurav Godar
700 _aGurung, Sekendra
700 _aPradhan, Sulav
700 _a Gaire, Sharma Utsav
942 _2ddc
_cPR
999 _c1735
_d1735